Home»Time Entries Audit loading ... [hide int notes] generated 8/9/2026 at 12:47:42 am took 0.34 seconds version: b85cbb8 helpers: v1
Territory: BMS Date: 6/24/26 [x] Company: MEC [x] Ticket: all User: all Type: all Role: all Bill: all Timesheet: all 6/22 Board: all Entry Status: all Ticket Status: all Issue: all [reset] Progress: 100% (2 of 2)
| row | id | Terr | Company | User | Date | Day | Start | End | Actual | Billed | Deduct | Inv Amt | Work Type | Work Role | Bill | Timesheet | Board | Entry Status | Ticket Status | Ticket # | Ticket Summary | Int Notes | Audit Done | Audit Notes | Notes | # issues | all issues | errors | warnings | notices |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 42050 | BMS | MEC | fdrewett | 6/24 | 9:00 am | 10:00 am | 1.00 | 1.00 | 0 | - | Sales | Sales | DoNotBill | 6/22 | Help Desk 2.1 | WrittenOff | -Closed | 77237 | Miller network walk | 1 | 7/28 CS sales role ok | Walked to the new building, took some pictures, and got a layout of where the data drops need to be, where the DMARC is, and where we will install the server and terminate the data drops to. | 1 | Notices: Work Role: Role not Standard Technician | Work Role: Role not Standard Technician | ||||
| 2 | 41755 | BMS | MEC | rclingan | 6/24 | 8:49 am | 9:05 am | 0.27 | 1.00 | 0 | 25.00 | Travel | Standard Technician | Billable | 6/22 | Help Desk 2.1 | Billed | -Closed | 77237 | Miller network walk | 0 | travel for onsite visit | 0 | |||||||
| 3 | 41756 | BMS | MEC | rclingan | 6/24 | 9:05 am | 9:42 am | 0.62 | 1.00 | 0 | 125.00 | Onsite | Standard Technician | Billable | 6/22 | Help Desk 2.1 | Billed | -Closed | 77237 | Miller network walk | 1 | 7/26 CS long notes ok | Site walk to check out new office and infrastructure requirements. Multi story building like the other office, we have access to a mechanical room with a telco rack that we can put equipment and server in. Passthrough hole is drilled between floors for a cable. Comcast is in "Verlyn office" where passthrough is. We will install a small rack \(min 6u\) for network switch, firewall, modem, patch panel, ups - in verlyn office. In mechanical room where server will live, we will pull network to from passthrough, install switch, ups, patch panel and shelf/server in rack. basement networking will branch from mechanical room. need to quote: * Access point * two 16 port poe switch * two patch panel * 6u rack * rackmount ups for network gear * two shelves | 1 | Notices: Notes: Notes longer than 500 characters | Notes: Notes longer than 500 characters |
Legend:
(hover over fields for details)
Notices
| Field | Message | Count |
|---|---|---|
| Notes | Notes longer than 500 characters | 1 |
| Work Role | Role not Standard Technician | 1 |
| Total | 2 | |