Home»Time Entries Audit loading ... [hide int notes] generated 8/8/2026 at 8:41:39 pm took 0.91 seconds version: b85cbb8 helpers: v1
Territory: BMS Month: « Jun 2026 » Company: all Ticket: all User: all Type: all Role: Sales [x] Bill: all Timesheet: 6/1 6/8 6/15 6/22 6/29 [x] Board: all Entry Status: all Ticket Status: all Issue: all [reset] Progress: 100% (3 of 3)
| row | id | Terr | Company | User | Date | Day | Start | End | Actual | Billed | Deduct | Inv Amt | Work Type | Work Role | Bill | Timesheet | Board | Entry Status | Ticket Status | Ticket # | Ticket Summary | Int Notes | Audit Done | Audit Notes | Notes | # issues | all issues | errors | warnings | notices |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 42050 | BMS | MEC | fdrewett | 6/24 | 9:00 am | 10:00 am | 1.00 | 1.00 | 0 | - | Sales | Sales | DoNotBill | 6/22 | Help Desk 2.1 | WrittenOff | -Closed | 77237 | Miller network walk | 1 | 7/28 CS sales role ok | Walked to the new building, took some pictures, and got a layout of where the data drops need to be, where the DMARC is, and where we will install the server and terminate the data drops to. | 1 | Notices: Work Role: Role not Standard Technician | Work Role: Role not Standard Technician | ||||
| 2 | 41818 | BMS | HH | rclingan | 6/25 | 12:50 pm | 1:47 pm | 0.95 | 1.00 | 0 | - | Sales | Sales | DoNotBill | 6/22 | Sales | WrittenOff | On Hold | 77371 | AOC Camera Revamp | 1 | 7/28 CS sales role ok, long notes ok | Current system does not support audio these are all analog cameras. "Lets price 25 - 30, we can add them for sure. I'd say 15 exterior grade and 15 interior " We need to verify if these current cameras are fed by siamese cable or ethernet, verify current position and lay them out on a design plan to ensure coverage before moving forward with any purchases. Any rg59/rg6 coax runs will need to be redone with cat6, if they are truly impossible we can use poe over 2 wire retrofit kits. keeping in mind these require poe ++ and are an added cost for each run. planned equipment would be NVR G2 Pro, 15x G6 bullet, 15x G6 turret, switch pro max 48 poe 4x24tb drives | 3 | Notices: Board: Board not 'Help Desk' or 'Help Desk 2.1', Notes: Notes longer than 500 characters, Work Role: Role not Standard Technician | Board: Board not 'Help Desk' or 'Help Desk 2.1', Notes: Notes longer than 500 characters, Work Role: Role not Standard Technician | ||||
| 3 | 41823 | BMS | MEC | rclingan | 6/25 | 2:45 pm | 3:12 pm | 0.45 | 0.50 | 0 | - | Sales | Sales | DoNotBill | 6/22 | Help Desk 2.1 | WrittenOff | -Closed | 77237 | Miller network walk | 1 | 7/28 CS sales role ok | gather all links for products and provide to admin team to prepare final quote. | 1 | Notices: Work Role: Role not Standard Technician | Work Role: Role not Standard Technician |
Legend:
(hover over fields for details)
Notices
| Field | Message | Count |
|---|---|---|
| Board | Board not 'Help Desk' or 'Help Desk 2.1' | 1 |
| Notes | Notes longer than 500 characters | 1 |
| Work Role | Role not Standard Technician | 3 |
| Total | 5 | |