Home»Time Entries Audit loading ... [hide int notes] generated 8/8/2026 at 9:32:18 pm took 0.93 seconds version: b85cbb8 helpers: v2

Territory: BMS Month: « Apr 2026 » Company: all Ticket: all User: fdrewett [x] Type: all Role: all Bill: all Timesheet: all  3/30 4/6 4/13 4/20 4/27 Board: all Entry Status: all Ticket Status: -Resolved / Verifying [x] Issue: all [reset] Progress: 0% (0 of 5)

row id Terr Company User Date Day Start End Actual Billed Deduct Inv Amt Work Type Work Role Bill Timesheet Board Entry Status Ticket Status Ticket # Ticket Summary Int Notes Audit Done Audit Notes Notes # issues all issues errors warnings notices
1 38960 BMS HH fdrewett 4/17 11:51 am 12:40 pm 0.82 1.00 0 150.00 Remote Standard Technician Billable 4/13 Help Desk 2.1 Billed -Resolved / Verifying 71559 Migration to M365 Time Tracking 0 walked with jesse about transition for AOC and Gateway programs as they operate 24/7 and will need access to certain things for at least a portion of the staff throughout the transition weekend. discussed the likelihood of transitioning a few people at each location either before 5/1 or on 5/1 after mx record change so that they are ready for the transition weekend without a disruption to service. 0
2 39147 BMS HH fdrewett 4/22 8:30 am 9:00 am 0.50 1.00 0 25.00 Travel Standard Technician Billable 4/20 Help Desk 2.1 Billed -Resolved / Verifying 71559 Migration to M365 Time Tracking 0 Travel to 2 Errors: Notes: Incomplete notes for travel, Work Type: No onsite entry found for travel (based on tech, date, company) Notes: Incomplete notes for travel, Work Type: No onsite entry found for travel (based on tech, date, company)
3 39146 BMS HH fdrewett 4/22 9:00 am 10:00 am 1.00 1.00 0 150.00 Remote Standard Technician Billable 4/20 Help Desk 2.1 Billed -Resolved / Verifying 71559 Migration to M365 Time Tracking 0 Onsite meeting with Jesse and Ryan. Melissa was remote. 1 Warnings: Work Type: Possible onsite/remote mismatch (work type vs notes) Work Type: Possible onsite/remote mismatch (work type vs notes)
4 39336 BMS HH fdrewett 4/24 8:15 am 2:00 pm 5.75 5.75 0 862.50 Remote Standard Technician Billable 4/20 Help Desk 2.1 Billed -Resolved / Verifying 71559 Migration to M365 Time Tracking 0 BitTitan MigrationWiz environment build-out for the Google Workspace to Microsoft 365 migration. Configured the Google Workspace source endpoint: created the GCP project, created the service account and JSON key, enabled the Gmail, Drive, Calendar, Contacts and Admin SDK APIs, and granted domain-wide delegation for the BitTitan OAuth scopes. Configured the Microsoft 365 destination endpoint: registered the MigrationWiz application in Entra ID, granted modern authentication consent, and provisioned the dedicated migration admin account. Extended troubleshooting of the Microsoft consent and authentication flow before Verify Credentials would pass against both endpoints. 1 Notices: Notes: Notes longer than 500 characters Notes: Notes longer than 500 characters
5 39650 BMS HH fdrewett 4/27 1:00 pm 5:00 pm 4.00 4.00 0 600.00 Remote Standard Technician Billable 4/27 Help Desk 2.1 Billed -Resolved / Verifying 71559 Migration to M365 Time Tracking 0 Built out the migration source data set. Updated the user tracking sheet against the current Google Admin export, then reviewed the full account list line by line with Jesse Hugg to confirm who migrates, who is archived, and how aliases and shared mailboxes are handled. Cleaned up and imported the finalized user list into MSPComplete via CSV and applied User Migration Bundle licensing. Created the Document migration project for My Drive to OneDrive and pre-provisioned each user's OneDrive so the Drive data had a destination to land in. 1 Notices: Notes: Notes longer than 500 characters Notes: Notes longer than 500 characters
6 39651 BMS HH fdrewett 4/28 11:00 am 3:00 pm 4.00 4.00 0 600.00 Remote Standard Technician Billable 4/27 Help Desk 2.1 Billed -Resolved / Verifying 71559 Migration to M365 Time Tracking 0 Reviewed the results of the pilot migrations - all trial passes completed successfully across mail, calendar, contacts and Drive data. Purchased and applied the remaining User Migration Bundle licenses to cover the balance of the user count. Kicked off the mailbox Pre-Stage Pass, starting with Jesse Hugg as the validation user, and monitored throughput, throttling and the error queue as the pass ran. 0
7 39652 BMS HH fdrewett 4/29 8:15 am 11:00 am 2.75 2.75 0 412.50 Remote Standard Technician Billable 4/27 Help Desk 2.1 Billed -Resolved / Verifying 71559 Migration to M365 Time Tracking 0 Continued the mailbox pre-stage. Worked the error queue from the overnight pass, re-driving failed items and running retries on the mailboxes that had not completed. Kicked off the Shared Drive to SharePoint migration project so the shared data would be staged alongside the mailboxes ahead of the cutover. 0
8 39659 BMS HH fdrewett 4/29 3:00 pm 5:00 pm 2.00 2.00 0 300.00 Onsite Standard Technician Billable 4/27 Help Desk 2.1 Billed -Resolved / Verifying 71559 Migration to M365 Time Tracking 0 onsite at aoc - signing up users for m365 1 Errors: Work Type: No travel entry found for onsite (based on tech, date, company) Work Type: No travel entry found for onsite (based on tech, date, company)
9 39657 BMS HH fdrewett 4/30 2:00 pm 5:00 pm 3.00 3.00 0 450.00 Remote Standard Technician Billable 4/27 Help Desk 2.1 Billed -Resolved / Verifying 71559 Migration to M365 Time Tracking 0 Call with Jesse Hugg to confirm the cutover plan and sequence for the weekend and to give a status update on migration progress. Continued working the mailbox pre-stage retries, with additional passes required on the larger mailboxes that had not finished inside the standard pass window. 0

Legend:
(hover over fields for details)

Error (3)
Warning (1)
Notice (2)


Tickets with over 5 hours in the current view (1)

Hours Ticket # Company Ticket Summary
23.50 71559 HH Migration to M365 Time Tracking


Errors

Field Message Count
Notes  Incomplete notes for travel  1
Work Type  No onsite entry found for travel (based on tech, date, company)  1
Work Type  No travel entry found for onsite (based on tech, date, company)  1
Total  3


Warnings

Field Message Count
Work Type  Possible onsite/remote mismatch (work type vs notes)  1
Total  1


Notices

Field Message Count
Notes  Notes longer than 500 characters  2
Total  2


39147 - fdrewett - 4/22 8:30 am - 71559 - Migration to M365 Time Tracking
No onsite entry found for travel (based on tech, date, company)
Incomplete notes for travel

39146 - fdrewett - 4/22 9:00 am - 71559 - Migration to M365 Time Tracking
Possible onsite/remote mismatch (work type vs notes)

39336 - fdrewett - 4/24 8:15 am - 71559 - Migration to M365 Time Tracking
Notes longer than 500 characters

39650 - fdrewett - 4/27 1:00 pm - 71559 - Migration to M365 Time Tracking
Notes longer than 500 characters

39659 - fdrewett - 4/29 3:00 pm - 71559 - Migration to M365 Time Tracking
No travel entry found for onsite (based on tech, date, company)