Home»Time Entries Audit loading ... [hide int notes] generated 8/8/2026 at 11:18:47 pm took 0.39 seconds version: b85cbb8 helpers: v2

Territory: BMS Month: « Mar 2026 » Company: all Ticket: 71673 [x] User: all Type: Onsite [x] Role: all Bill: all Timesheet: all  3/2 3/9 3/16 3/23 3/30 Board: all Entry Status: all Ticket Status: all Issue: all [reset] Progress: 0% (0 of 1)

row id Terr Company User Date Day Start End Actual Billed Deduct Inv Amt Work Type Work Role Bill Timesheet Board Entry Status Ticket Status Ticket # Ticket Summary Int Notes Audit Done Audit Notes Notes # issues all issues errors warnings notices
1 36384 BMS IC rclingan 3/10 1:44 pm 2:01 pm 0.28 1.00 0 125.00 Onsite Standard Technician Billable 3/9 Help Desk 2.1 Billed -Closed 71673 Wiring for New Building 0 site walk with angelo to double check low voltage needs and discuss the options and needs. * drywall is already in all the way to ceiling - able to make holes as needed and they will patch * 4 upstairs offices 3 downstairs and a conference room * will need to pass cable through the floor above network rack total drops if 2 per office 19 1 Errors: Work Type: No travel entry found for onsite (based on tech, date, company) Work Type: No travel entry found for onsite (based on tech, date, company)

Legend:
(hover over fields for details)

Error (1)
Warning (0)
Notice (0)


Errors

Field Message Count
Work Type  No travel entry found for onsite (based on tech, date, company)  1
Total  1


36384 - rclingan - 3/10 1:44 pm - 71673 - Wiring for New Building
No travel entry found for onsite (based on tech, date, company)