Home»Time Entries Audit loading ... [hide int notes] generated 8/8/2026 at 9:40:57 pm took 0.78 seconds version: b85cbb8 helpers: v2

Territory: BMS Month: « Apr 2026 » Company: all Ticket: 68336 [x] User: all Type: all Role: all Bill: all Timesheet: all  3/30 4/6 4/13 4/20 4/27 Board: all Entry Status: Billed [x] Ticket Status: all Issue: all [reset]

row id Terr Company User Date Day Start End Actual Billed Deduct Inv Amt Work Type Work Role Bill Timesheet Board Entry Status Ticket Status Ticket # Ticket Summary Int Notes Audit Done Audit Notes Notes # issues all issues errors warnings notices
1 38449 BMS IC rclingan 4/9 2:00 pm 3:30 pm 1.50 1.50 0 187.50 Remote Standard Technician Billable 4/6 Help Desk 2.1 Billed -Closed 68336 New Laptops and Setups for Welding Shop & Conference Set Up 0 Finish setup of 14" laptop install project and outlook and any other necessary applications 0
2 38943 BMS IC rclingan 4/17 10:04 am 10:23 am 0.32 1.00 0 25.00 Travel Standard Technician Billable 4/13 Help Desk 2.1 Billed -Closed 68336 New Laptops and Setups for Welding Shop & Conference Set Up 0 Travel for onsite visit. 0
3 38944 BMS IC rclingan 4/17 10:23 am 10:40 am 0.28 1.00 0 125.00 Onsite Standard Technician Billable 4/13 Help Desk 2.1 Billed -Closed 68336 New Laptops and Setups for Welding Shop & Conference Set Up 0 check in with angelo on status of new building and walk through site to view current drops and discuss any additional needs such as the conference room drops/electrical for tv plan to return next week to begin terminating drops installed by electricians. 0
4 39177 BMS IC rclingan 4/22 11:00 am 11:19 am 0.32 1.00 0 25.00 Travel Standard Technician Billable 4/20 Help Desk 2.1 Billed -Closed 68336 New Laptops and Setups for Welding Shop & Conference Set Up 0 travel for onsite visit. 0
5 39178 BMS IC rclingan 4/22 11:19 am 1:55 pm 2.60 2.75 0 343.75 Onsite Standard Technician Billable 4/20 Help Desk 2.1 Billed -Closed 68336 New Laptops and Setups for Welding Shop & Conference Set Up 0 onsite to terminate and clean up server room wiring. terminate all pulled cable into keystones dress cable runs patch keystones into patch panel and patch panel into switch office terminations are waiting on white keystones and faceplates that should arrive 4/23/26 discussed progress with angelo and plan for friday to return and terminate office cables so they can move in the week of 4/27 0
6 39351 BMS IC rclingan 4/24 11:00 am 11:30 am 0.50 1.00 0 25.00 Travel Standard Technician Billable 4/20 Help Desk 2.1 Billed -Closed 68336 New Laptops and Setups for Welding Shop & Conference Set Up 0 Travel for onsite visit, stopped at graybar for supplies for job. 0
7 39353 BMS IC rclingan 4/24 11:30 am 1:07 pm 1.62 1.75 0 218.75 Onsite Standard Technician Billable 4/20 Help Desk 2.1 Billed -Closed 68336 New Laptops and Setups for Welding Shop & Conference Set Up 0 Onsite termination of ethernet drops in offices. Clean up terminations and install faceplates. Two offices need single keystone faceplates and there are 3 blanks that are needed to cover job boxes not in use. verify drops are passing gigabit and poe. 0

Legend:
(hover over fields for details)

Error (0)
Warning (0)
Notice (0)


Tickets with over 5 hours in the current view (1)

Hours Ticket # Company Ticket Summary
7.00 68336 IC New Laptops and Setups for Welding Shop & Conference Set Up