Home»Time Entries Audit loading ... generated 8/7/2026 at 5:28:04 pm took 0.46 seconds version: 5436fa4 helpers: v2

Territory: BMS Date: 7/7/26 [x] Company: all Ticket: all User: rclingan [x] Type: all Role: all Bill: all Timesheet: all  7/6 Board: all Entry Status: Open [x] Ticket Status: all Issue: all [reset] Progress: 100% (1 of 1)

row id Terr Company User Date Day Start End Actual Billed Deduct Inv Amt Work Type Work Role Bill Timesheet Board Entry Status Ticket Status Ticket # Ticket Summary Int Notes Audit Done Audit Notes Notes # issues all issues errors warnings notices
1 42356 BMS IC rclingan 7/7 10:28 am 10:45 am 0.28 1.00 0 25.00 Travel Standard Technician Billable 7/6 Help Desk 2.1 Open -Closed 78900 Fraud Email 1 8/6 CS fixed travel entered as remote travel for onsite visit 0
2 42355 BMS IC rclingan 7/7 10:45 am 11:06 am 0.35 1.00 0 125.00 Onsite Standard Technician Billable 7/6 Help Desk 2.1 Open -Closed 78900 Fraud Email 0 Onsite visit to discuss Identity and licensing upgrade to prevent continued email breaches and reduce the amount of remediations needed. 0
3 42234 BMS PPT rclingan 7/7 11:58 am 12:08 pm 0.17 0.25 0 31.25 Remote Standard Technician Billable 7/6 Help Desk 2.1 Open -Closed 79015 Recon Folder 0 She should have access now, she will just need to sign fully out of the computer and server and then sign back in to get the drive maps. 0
4 42339 BMS CT rclingan 7/7 1:14 pm 1:34 pm 0.33 1.00 0 25.00 Travel Standard Technician Billable 7/6 Help Desk 2.1 Open -Closed 79089 Access Control Install 0 travel time for onsite visit 0
5 42340 BMS CT rclingan 7/7 1:34 pm 5:40 pm 4.10 4.25 0 531.25 Onsite Standard Technician Billable 7/6 Help Desk 2.1 Open -Closed 79089 Access Control Install 0 onsite visit to begin access control install begin wire pulls begin hanging unifi hub minis begin cutting in g3 readers 0

Legend:
(hover over fields for details)

Error (0)
Warning (0)
Notice (0)