Home»Time Entries Audit loading ... [hide int notes] generated 8/8/2026 at 8:38:18 pm took 0.31 seconds version: b85cbb8 helpers: v1

Territory: BMS Date: 6/24/26 [x] Company: all Ticket: 77237 [x] User: all Type: all Role: all Bill: all Timesheet: all  6/22 Board: all Entry Status: all Ticket Status: all Issue: all [reset] Progress: 100% (2 of 2)

row id Terr Company User Date Day Start End Actual Billed Deduct Inv Amt Work Type Work Role Bill Timesheet Board Entry Status Ticket Status Ticket # Ticket Summary Int Notes Audit Done Audit Notes Notes # issues all issues errors warnings notices
1 42050 BMS MEC fdrewett 6/24 9:00 am 10:00 am 1.00 1.00 0 - Sales Sales DoNotBill 6/22 Help Desk 2.1 WrittenOff -Closed 77237 Miller network walk 1 7/28 CS sales role ok Walked to the new building, took some pictures, and got a layout of where the data drops need to be, where the DMARC is, and where we will install the server and terminate the data drops to. 1 Notices: Work Role: Role not Standard Technician Work Role: Role not Standard Technician
2 41755 BMS MEC rclingan 6/24 8:49 am 9:05 am 0.27 1.00 0 25.00 Travel Standard Technician Billable 6/22 Help Desk 2.1 Billed -Closed 77237 Miller network walk 0 travel for onsite visit 0
3 41756 BMS MEC rclingan 6/24 9:05 am 9:42 am 0.62 1.00 0 125.00 Onsite Standard Technician Billable 6/22 Help Desk 2.1 Billed -Closed 77237 Miller network walk 1 7/26 CS long notes ok Site walk to check out new office and infrastructure requirements. Multi story building like the other office, we have access to a mechanical room with a telco rack that we can put equipment and server in. Passthrough hole is drilled between floors for a cable. Comcast is in "Verlyn office" where passthrough is. We will install a small rack \(min 6u\) for network switch, firewall, modem, patch panel, ups - in verlyn office. In mechanical room where server will live, we will pull network to from passthrough, install switch, ups, patch panel and shelf/server in rack. basement networking will branch from mechanical room. need to quote: * Access point * two 16 port poe switch * two patch panel * 6u rack * rackmount ups for network gear * two shelves 1 Notices: Notes: Notes longer than 500 characters Notes: Notes longer than 500 characters

Legend:
(hover over fields for details)

Error (0)
Warning (0)
Notice (2)


Notices

Field Message Count
Notes  Notes longer than 500 characters  1
Work Role  Role not Standard Technician  1
Total  2


42050 - fdrewett - 6/24 9:00 am - 77237 - Miller network walk
Role not Standard Technician

41756 - rclingan - 6/24 9:05 am - 77237 - Miller network walk
Notes longer than 500 characters