Home»Time Entries Audit loading ... [hide int notes] generated 8/8/2026 at 10:25:14 pm took 0.40 seconds version: b85cbb8 helpers: v2

Territory: BMS Date: 4/24/26 [x] Company: all Ticket: all User: all Type: all Role: all Bill: all Timesheet: all  4/20 Board: all Entry Status: Billed [x] Ticket Status: all Issue: all [reset] Progress: 0% (0 of 1)

row id Terr Company User Date Day Start End Actual Billed Deduct Inv Amt Work Type Work Role Bill Timesheet Board Entry Status Ticket Status Ticket # Ticket Summary Int Notes Audit Done Audit Notes Notes # issues all issues errors warnings notices
1 39336 BMS HH fdrewett 4/24 8:15 am 2:00 pm 5.75 5.75 0 862.50 Remote Standard Technician Billable 4/20 Help Desk 2.1 Billed -Resolved / Verifying 71559 Migration to M365 Time Tracking 0 BitTitan MigrationWiz environment build-out for the Google Workspace to Microsoft 365 migration. Configured the Google Workspace source endpoint: created the GCP project, created the service account and JSON key, enabled the Gmail, Drive, Calendar, Contacts and Admin SDK APIs, and granted domain-wide delegation for the BitTitan OAuth scopes. Configured the Microsoft 365 destination endpoint: registered the MigrationWiz application in Entra ID, granted modern authentication consent, and provisioned the dedicated migration admin account. Extended troubleshooting of the Microsoft consent and authentication flow before Verify Credentials would pass against both endpoints. 1 Notices: Notes: Notes longer than 500 characters Notes: Notes longer than 500 characters
2 39351 BMS IC rclingan 4/24 11:00 am 11:30 am 0.50 1.00 0 25.00 Travel Standard Technician Billable 4/20 Help Desk 2.1 Billed -Closed 68336 New Laptops and Setups for Welding Shop & Conference Set Up 0 Travel for onsite visit, stopped at graybar for supplies for job. 0
3 39353 BMS IC rclingan 4/24 11:30 am 1:07 pm 1.62 1.75 0 218.75 Onsite Standard Technician Billable 4/20 Help Desk 2.1 Billed -Closed 68336 New Laptops and Setups for Welding Shop & Conference Set Up 0 Onsite termination of ethernet drops in offices. Clean up terminations and install faceplates. Two offices need single keystone faceplates and there are 3 blanks that are needed to cover job boxes not in use. verify drops are passing gigabit and poe. 0

Legend:
(hover over fields for details)

Error (0)
Warning (0)
Notice (1)


Tickets with over 5 hours in the current view (1)

Hours Ticket # Company Ticket Summary
5.75 71559 HH Migration to M365 Time Tracking


Notices

Field Message Count
Notes  Notes longer than 500 characters  1
Total  1


39336 - fdrewett - 4/24 8:15 am - 71559 - Migration to M365 Time Tracking
Notes longer than 500 characters