Home»Time Entries Audit loading ... [hide int notes] generated 8/9/2026 at 12:46:00 am took 5.34 seconds version: b85cbb8 helpers: v2
Territory: BMS Month: « Apr 2026 » Company: AIAM [x] Ticket: all User: rclingan [x] Type: all Role: all Bill: all Timesheet: all 3/30 4/6 4/13 4/20 4/27 Board: all Entry Status: all Ticket Status: all Issue: all [reset] Progress: 0% (0 of 1)
| row | id | Terr | Company | User | Date | Day | Start | End | Actual | Billed | Deduct | Inv Amt | Work Type | Work Role | Bill | Timesheet | Board | Entry Status | Ticket Status | Ticket # | Ticket Summary | Int Notes | Audit Done | Audit Notes | Notes | # issues | all issues | errors | warnings | notices |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 38503 | BMS | AIAM | rclingan | 4/10 | 10:03 am | 10:19 am | 0.27 | 1.00 | 0 | 25.00 | Travel | Standard Technician | Billable | 4/6 | Help Desk 2.1 | Billed | -Closed | 71682 | AMR - New vibration sensor for the mill | 0 | Travel for onsite visit. | 0 | |||||||
| 2 | 38504 | BMS | AIAM | rclingan | 4/10 | 10:19 am | 11:02 am | 0.72 | 1.00 | 0 | 125.00 | Onsite | Standard Technician | Billable | 4/6 | Help Desk 2.1 | Billed | -Closed | 71682 | AMR - New vibration sensor for the mill | 0 | Onsite installation of Dodge Gateway for vibration sensor and initial testing of one vibration sensor and making sure the placement of the gateway provides good signal to sensors. | 0 | |||||||
| 3 | 38589 | BMS | AIAM | rclingan | 4/13 | 9:35 am | 9:44 am | 0.15 | 1.00 | 0 | 25.00 | Travel | Standard Technician | Billable | 4/13 | Help Desk 2.1 | Billed | -Closed | 71682 | AMR - New vibration sensor for the mill | 0 | Travel for onsite visit. | 0 | |||||||
| 4 | 38590 | BMS | AIAM | rclingan | 4/13 | 9:44 am | 10:17 am | 0.55 | 1.00 | 0 | 125.00 | Onsite | Standard Technician | Billable | 4/13 | Help Desk 2.1 | Billed | -Closed | 71682 | AMR - New vibration sensor for the mill | 0 | onsite visit to look at ir camera for mill and reset switch in the north building as it is showing offline | 0 | |||||||
| 5 | 38849 | BMS | AIAM | rclingan | 4/15 | 2:00 pm | 2:17 pm | 0.28 | 1.00 | 0 | 25.00 | Travel | Standard Technician | Billable | 4/13 | Help Desk 2.1 | Billed | -Closed | 74316 | New Laptop for Crystal | 0 | Travel for onsite visit. | 0 | |||||||
| 6 | 38850 | BMS | AIAM | rclingan | 4/15 | 2:17 pm | 2:23 pm | 0.10 | 1.00 | 0 | 125.00 | Onsite | Standard Technician | Billable | 4/13 | Help Desk 2.1 | Billed | -Closed | 74316 | New Laptop for Crystal | 0 | onsite setup of laptop in the server closet ensure laptop is powered on and connected to network for remote access by employee. | 0 | |||||||
| 7 | 39181 | BMS | AIAM | rclingan | 4/22 | 2:30 pm | 2:45 pm | 0.25 | 0.25 | 0 | 31.25 | Remote | Standard Technician | Billable | 4/20 | Help Desk 2.1 | Billed | -Closed | 74698 | New voicemail from Acme Main (505) 345-2457 | 0 | talked to paula on the phone and tried to walk her through turning computer back on, frank is headed onsite shortly. | 1 | Warnings: Work Type: Possible onsite/remote mismatch (work type vs notes) | Work Type: Possible onsite/remote mismatch (work type vs notes) |
Legend:
(hover over fields for details)
Warnings
| Field | Message | Count |
|---|---|---|
| Work Type | Possible onsite/remote mismatch (work type vs notes) | 1 |
| Total | 1 | |