Home»Time Entries Audit loading ... generated 8/7/2026 at 2:39:50 pm took 0.92 seconds version: 5436fa4 helpers: v2

Territory: BMS Dates: 7/1/26 to 7/31/26 Company: all Ticket: all User: rclingan [x] Type: all Role: all Bill: all Timesheet: all  6/29 7/6 7/13 7/20 7/27 Board: Help Desk 2.1 [x] Entry Status: all Ticket Status: On-Hold - Customer [x] Issue: all [reset]

row id Terr Company User Date Day Start End Actual Billed Deduct Inv Amt Work Type Work Role Bill Timesheet Board Entry Status Ticket Status Ticket # Ticket Summary Int Notes Audit Done Audit Notes Notes # issues all issues errors warnings notices
1 42709 BMS MEC rclingan 7/15 4:30 pm 5:13 pm 0.72 0.75 0 93.75 Remote Standard Technician Billable 7/13 Help Desk 2.1 PendingApproval On-Hold - Customer 79235 Wiring Time Tracking 0 gather missing materials that are available at atg office - multibit drill grommet blank faceplate cut down back board for rack mount to size 0
2 42710 BMS MEC rclingan 7/15 5:13 pm 5:23 pm 0.17 1.00 0 25.00 Travel Standard Technician Billable 7/13 Help Desk 2.1 PendingApproval On-Hold - Customer 79235 Wiring Time Tracking 0 Travel to lowes for material purchase for job 0
3 42711 BMS MEC rclingan 7/15 5:23 pm 5:37 pm 0.23 1.00 0 125.00 Onsite Standard Technician Billable 7/13 Help Desk 2.1 PendingApproval On-Hold - Customer 79235 Wiring Time Tracking 0 purchased low voltage boxes and new oscillating saw blade carbide reinforced. 0
4 42759 BMS MEC rclingan 7/16 3:05 pm 3:30 pm 0.42 1.00 0 25.00 Travel Standard Technician Billable 7/13 Help Desk 2.1 PendingApproval On-Hold - Customer 79235 Wiring Time Tracking 0 travel to miller engineering clinic 0
5 42760 BMS MEC rclingan 7/16 3:30 pm 5:42 pm 2.20 2.25 0 281.25 Onsite Standard Technician Billable 7/13 Help Desk 2.1 PendingApproval On-Hold - Customer 79235 Wiring Time Tracking 0 Onsite hang rack cut in boxes for bulk of wiring upstairs to go into rack from ceiling run cord for upstairs <-> downstairs link clean up tools and trash stack and organize equipment to go into racks upstairs and downstairs 0
6 42934 BMS MEC rclingan 7/21 11:35 am 11:50 am 0.25 1.00 0 25.00 Travel Standard Technician Billable 7/20 Help Desk 2.1 Open On-Hold - Customer 79235 Wiring Time Tracking 0 travel for onsite visit 0
7 42935 BMS MEC rclingan 7/21 11:50 am 2:33 pm 2.72 2.75 0 343.75 Onsite Standard Technician Billable 7/20 Help Desk 2.1 Open On-Hold - Customer 79235 Wiring Time Tracking 0 onsite visit tone all keystones, place in rack patch panel in order 1-10 ap-15 interconnect-16 \(Scheme translates across both floors\) rack all equipment that is onsite tidy up rack, mount xfinity equipment to board clean up tools and packup 0

Legend:
(hover over fields for details)

Error (0)
Warning (0)
Notice (0)


Tickets with over 5 hours in the current view (1)

Hours Ticket # Company Ticket Summary
6.75 79235 MEC Wiring Time Tracking